Metropolitan Washington Airport Authority

Comprehensive Traffic and Revenue Study, 2012 Final Report

The traffic and toll revenue study was initiated in June 2011.  This Final Draft is an update from the Working Draft, dated April 2012.  The Final Report incorporates the subsequent results of the toll rate setting process for 2013 and 2014 that concluded in late 2012 as well as updated information for certain tables.  Also included are the toll Sensitivity Analysis (Chapter 5) and Sensitivity Tests (Chapter 6). 

Click here to download the document (PDF, 7.85MB)

Click here to download the appendices (PDF, 5.51MB)