Metropolitan Washington Airport Authority

Current Opportunities - Construction

The Metropolitan Washington Airports Authority has issued the following Construction contracting opportunities:

RFP 1-09-C212: Main Terminal Restroom Renovation, Dulles Airport NEW!
- Description: The Contractor shall provide all necessary labor, materials, tools, equipment and supervision for the renovation of six sets of public restrooms in the Main Terminal at Washington Dulles International Airport. Work will include demolition of existing restroom spaces and rebuilding with new dura-rock substrate, ceramic tile floors and walls, stainless steel toilet partitioins, toilets, urinals, sinks, vanities, paritions and walls; lighting and accessories.
- Issue Date: November 19, 2009
- Due Date for Proposals: December 29, 2009
- Amendments Issued: None
- LDBE Requirement: 100%
- Project Overview
- Download Documents

RFP 1-09-C228: Hanger 5 Roof Replacement, National Airport NEW!
- Description: The Contractor shall furnish all necessary labor, materials, tools, equipment and supervision to construct a new roof system for portions of Hangar 5 at Ronald Reagan Washington National Airport. In addition, the overflow drainage system, including roof drains, will be expanded to the roof of the Hangar 5 bay area and to the lower roof over the office spaces.
- Issue Date: November 12, 2009
- Due Date for Proposals: December 18, 2009
- Amendments Issued: None
- LDBE Requirement: 100%
- Project Overview
- Download Documents

RFP 1-09-C222: West Perimeter Security Enhancements, Dulles Airport
- Description: The Contractor shall furnish all necessary labor, materials, tools, equipment and supervision to construct 32 pole-mounted CCTV cameras along the West AOA fenceline at Washington Dulles International Airport. The work includes but is not limited to selective demolition, erosion controls, excavation, backfill, utility locating and relocating, traffic control, landscaping, bollards, 3-way 4-inch conduit ductbank and all wiring, fiber optic cables, video management system and other incidental items as described in the project specifications and drawings.
- Issue Date: November 9, 2009
- Due Date for Proposals: December 15, 2009
- Amendments Issued: None
- LDBE Requirement: 100%
- Project Overview
- Download Documents

RFP 1-09-C215: Task Order Construction Services, National and Dulles Airports
- Description: The Contractor shall furnish all necessary labor, materials, tools, equipment and supervision for Task Order Construction Services at Ronald Reagan Washington National and Washington Dulles International Airports.
- Issue Date: November 3, 2009
- Due Date for Proposals: December 9, 2009
- Amendments Issued: None
- LDBE Requirement: 30%
- Project Overview
- Download Documents

RFP 1-09-C216: Call Order Construction Services, National and Dulles Airports
- Description: The Contractor shall furnish all necessary labor, materials, tools, equipment and supervision for Call Order Construction Services at Ronald Reagan Washington National and Washington Dulles International Airports.
- Issue Date: November 3, 2009
- Due Date for Proposals: December 9, 2009
- Amendments Issued: None
- LDBE Requirement: 100%
- Project Overview
- Download Documents

RFP 1-09-C209: Utility Line Services, National Airport
- Description: The Contractor shall provide on-call services for all labor, material, equipment and supervision necessary for making repairs and/or replacement of all sizes and types of water lines, fire lines, sewer lines, steam and industrial waste lines including inside structures located at Ronald Reagan Washington National Airport.
- Issue Date: October 29, 2009
- Due Date for Proposals: November 30, 2009
- Amendments Issued: None
- LDBE Requirement: 100%
- Project Overview
- Download Documents