IFB 1-14-C008: Hangar 6 Roof Replacement, National Airport

PROJECT OVERVIEW
|
IFB Issue Date: November 6, 2013
Deadline for Bids: 2:00 PM (Eastern), January 9, 2014
Pre-Bid Conference: 10:00 AM (Eastern), November 14, 2013 at the East Building Second Floor Conference Room, National Airport
Question Submission: The deadline for submitting questions has passed.
No further questions will be accepted.
Estimated Dollar Value: $500,000 - $1,000,000
Project Duration: 151 days from Notice to Proceed
Bond Requirements: 5% Bid, 100% Payment, 100% Performance
Project Summary:
The Contractor shall furnish all necessary labor, materials, tools, equipment and supervision to replace the existing roofing on Hangar 6 at Ronald Reagan Washington National Airport. The re-roofing project scope includes the high main hangar roof and the lower roof over the existing two story offices facing the public roadway. Also included are the replacement of roof drains and the addition of overflow drains. The total area of re-roofing is approximately 45,000 SF with 6,000 SF on the lower roof and 39,000 SF on the high roof.
LDBE Requirement:
This IFB has a 100% Local Disadvantaged Business Enterprise (LDBE) participation requirement and a 25% Voluntary MBE/WBE goal. Firms located within a 100-mile radius and whose 3 year average gross receipts, including all affiliates, do not exceed the size standard(s) below are eligible for consideration. For more LDBE/MBE/WBE information, including other LDBE size standards, contact the Equal Opportunity Programs Department at 703-417-8625.
LDBE Size Standards:
NAICS Code Type of Work / Service LDBE Size Standard
238160 Roofing Contractors $14.0 Million
238190 Other Foundations, Structure and Building Exterior Contractors $14.0 Million
238220 Plumbing, Heating, A/C, Ventilation Contractors $14.0 Million
Amendments Issued:
One, December 9, 2013.  The due date for bids is extended from December 12, 2013 to January 9, 2014.
CLICK HERE to download Amendment Documents
Last Updated December 9, 2013