RFQI 1-13-C092: Design Campus Utility Distribution and Central Plant Improvements, National Airport

PROJECT OVERVIEW
|
RFQI Issue Date: April 24, 2013
Deadline for Qualifications: 2:00 PM (Eastern), May 29, 2013
Question Submission: The deadline for submitting questions has passed.
No further questions will be accepted.
Estimated Dollar Value: Up to $15,000,000
Project Duration: Five Years
Project Summary:
The Contractor shall provide professional architectural and engineering services to conduct utility system analysis and design engineering for enhancement of the central HVAC plant and related utility distribution systems at Ronald Reagan Washington National Airport. Integral to the work will be recommissioning of existing systems to ensure continuous and reliable system operation while achieving optimum efficiency.

Utility Systems to be evaluated include, but are not limited to high temperature hot water, chilled water, cooling tower and condenser water, building HVAC and controls, domestic water distribution, natural gas, sanitary collection systems, storm water collection, electrical distribution, building automation, energy conservation, thermal storage, steam/reheat and Foxborough plant control.
LDBE Requirement:
The contract resulting from this RFQI will have a 30% Local Disadvantaged Business Enterprise (LDBE) participation requirement. Firms located within a 100-mile radius and whose 3 year average gross receipts, including all affiliates, do not exceed the size standard(s) below are eligible for consideration. For more LDBE/MBE/WBE information, including other LDBE size standards, contact the Equal Opportunity Programs Department at 703-417-8625.
LDBE Size Standards:
NAICS Code Type of Work / Service LDBE Size Standard
541310 Architectural Services $7.0 Million
541330 Engineering Services $14.0 Million
Amendments Issued:
None
Last Updated May 13, 2013