RFP 1-13-C077: Landside Walkback Tunnel Under-Slab Drainage System & Terrazzo Replacement, Dulles Airport

PROJECT OVERVIEW
|
RFP Issue Date: April 2, 2013
Deadline for Proposals: 1:00 PM (Eastern), May 1, 2013
Pre-Proposal Conference: 9:30 AM (Eastern), April 10, 2013 at Conference Room 1, Fourth Floor, 45025 Aviation Drive, Dulles Airport
Question Submission: The deadline for submitting questions has passed.
No further questions will be accepted.
Estimated Dollar Value: $250,000 - $300,000
Project Duration: 90 days from Notice to Proceed
Bond Requirements: 100% Payment, 100% Performance
Project Summary:
The Contractor shall furnish all necessary labor, materials, tools, equipment and supervision for the demolition and removal of the existing flooring in required areas, installation of a new under-slab drainage system, restoration of the flooring and all necessary incidentals throughout the walkback tunnel from the Main Terminal Building to the North Flank Daily Parking Garage at Washington Dulles International Airport.
LDBE Requirement:
This RFP has a 40% Local Disadvantaged Business Enterprise (LDBE) participation requirement and a 25% Voluntary MBE/WBE goal. Firms located within a 100-mile radius and whose 3 year average gross receipts, including all affiliates, do not exceed the size standard(s) below are eligible for consideration. For more LDBE/MBE/WBE information, including other LDBE size standards, contact the Equal Opportunity Programs Department at 703-417-8625.
LDBE Size Standards:
NAICS Code Type of Work / Service LDBE Size Standard
237110 Water and Sewer Line and Related Structures Construction $33.5 Million
238340 Tile and Terrazzo Contractors $14.0 Million
238910 Site Preparation Contractors $14.0 Million
Amendments Issued:
None
Last Updated April 16, 2013