RFP 1-13-C057: Combined Electrical System Upgrades, National Airport

PROJECT OVERVIEW
|
RFP Issue Date: January 22, 2013
Deadline for Proposals: 2:00 PM (Eastern), February 21, 2013
Pre-Proposal Conference: 10:00 AM (Eastern), January 29, 2013 at the East Building Second Floor Conference Room, 2505 Abingdon Drive, National Airport
Question Submission: The deadline for submitting questions has passed.
No further questions will be accepted.
Estimated Dollar Value: $1,000,000 - $5,000,000
Project Duration: 358 days from Notice to Proceed
Bond Requirements: 100% Payment, 100% Performance
Project Summary:
The Contractor shall furnish all necessary labor, materials, tools, equipment and supervision to construct four electrical system upgrade projects at Ronald Reagan Washington National Airport:
(1) COB 100% Backup Electrical Power (Part A)
(2) Terminal A Banjo Standby Power Upgrades (Part C)
(3) South Hangar Line Standby Power Upgrades (Part D)
(4) Replacement of Electrical Transformers (Part E)

Work includes the following: provide, install and connect for correct operation two standby generator systems with enclosures, automatic transfer switches, standby distribution systems, replace power transformers, panelboards, switches, transformers, raceways, ductbank, cabling, grounding, surface paving, landscaping, demolition of existing electrical equipment, raceways and cabling.
LDBE Requirement:
This RFP has a 65% Local Disadvantaged Business Enterprise (LDBE) participation requirement and a 25% Voluntary MBE/WBE goal. Firms located within a 100-mile radius and whose 3 year average gross receipts, including all affiliates, do not exceed the size standard(s) below are eligible for consideration. For more LDBE/MBE/WBE information, including other LDBE size standards, contact the Equal Opportunity Programs Department at 703-417-8625.
LDBE Size Standards:
NAICS Code Type of Work / Service LDBE Size Standard
237310 Highway, Street & Bridge Construction $33.5 Million
238110 Poured Concrete Foundation and Structure Contractors $14.0 Million
238210 Electrical Contractors $14.0 Million
238910 Site Preparation Contractors $14.0 Million
Amendments Issued:
One, February 13, 2013.  The due date for proposals remains unchanged.