Current Opportunities - Construction

The Metropolitan Washington Airports Authority has issued the following Construction contracting opportunities:

1-14-C061: Combined Taxilane C and Taxiway Z Reconstruction, Dulles Airport NEW!
- Description: The Contractor shall furnish all necessary labor, materials, tools, equipment and supervision to reconstruct Section 1 of Taxilane C and Section 2 of Taxiway Z at Washington Dulles International Airport. Work requires specific phasing and includes approximately 21,000 square yards of full depth PCC replacement, including new joint spacing and underdrain system.
- Solicitation Issue Date: April 7, 2014
- Due Date for Submissions: May 8, 2014
- Amendments Issued: None
- DBE Goal: 25%
- Project Overview
- Download Documents

1-14-C054: Dedicated Fire System Surge Prevention, Dulles Airport
- Description: The Contractor shall furnish all necessary labor, materials, tools, equipment and supervision to supply and install redundant pressure control valves in the Dedicated Fire System at Washington Dulles International Airport to remediate system-wide pressure excursions. The project includes earthwork, excavation, utility piping modification, precast concrete vault installation, roadway patching, and limited electrical, instrumentation and controls. Also included are system calibration of existing fire pump controllers for proper sequence operation.
- Solicitation Issue Date: March 27, 2014
- Due Date for Submissions: May 1, 2014
- Amendments Issued: None
- LDBE Requirement: 70%
- Project Overview
- Download Documents

1-14-C058: Hydrant Fuel Line Improvements, Dulles Airport UPDATED!
- Description: The Contractor shall furnish all necessary labor, materials, tools, equipment and supervision to construct hydrant fuel line improvements at Washington Dulles International Airport. Work includes new underground hydrant fuel piping, hydrant cart test stand, grouting and abandoning existing hydrant fuel lines, replacing valve pits with spool piping, reconfigure leak detection system, cathodic protection investigation and installation and connect new lines to emergency fuel shut off system.
- Solicitation Issue Date: March 24, 2014
- Due Date for Submissions: May 1, 2014
- Amendments Issued: One
- LDBE Requirement: 20%
- Project Overview
- Download Documents

1-14-C059: Jet Bridge Power Upgrades, Dulles Airport
- Description: The Contractor shall furnish all necessary labor, materials, tools, equipment and supervision to upgrade power systems on Jet Bridges serving Concourse B Gates A15, A31, A32, B37, & B44 at Washington Dulles International Airport. Work includes demolition and installation of new control connections to existing HVAC equipment and VAV boxes including testing and balancing of all VAV boxes and air devices.
- Solicitation Issue Date: March 24, 2014
- Due Date for Submissions: April 24, 2014
- Amendments Issued: None
- LDBE Requirement: 45%
- Project Overview
- Download Documents