Business Information
- Business Information
- Contracting Opportunities
- General Information
- Equal Opportunity Programs
- Concessions
- Current Contracting Opportunities
- Construction
- Design / Build
- Architectural and Engineering
- Services
- Goods and Equipment
- Concessions
- Dulles Corridor Metrorail Project
- Land Development
- Upcoming Opportunities
- Award Information
- PROJECT eLERT
- MWAA iSupplier Portal
- Materials Management Division
- Tenant Information
- Building Codes Dept
Current Opportunities - Construction
The Metropolitan Washington Airports Authority has issued the following Construction contracting opportunities:
RFP 1-13-C167: Preconditioned Air Units and 180Kva Ground Power Unit, Dulles Airport NEW!
| Description: The Contractor shall furnish all necessary labor, materials, tools, equipment and supervision to provide and install three new preconditioned air (PCAir) units and one ground power unit (GPU) at Washington Dulles International Airport. Work includes designing, engineering, manufacturing and factory testing of PCAir and GPU units and the removal of existing units. | |
| Issue Date: June 11, 2013 | |
| Due Date for Proposals: July 10, 2013 | |
| Amendments Issued: None | |
| LDBE Requirement: None | |
| Project Overview | |
| Download Documents |
RFP 7-13-C019: Roadway Maintenance and Repairs, On-Call, Dulles Toll Road NEW!
| Description: The Contractor shall furnish all necessary labor, materials, tools, equipment and supervision to perform roadway maintenance and repair services for the Dulles Toll Road on an on-call basis, to include pavement and associated roadway incidental maintenance, concrete decks, parking lots, sidewalks, curbs and gutters. | |
| Issue Date: June 3, 2013 | |
| Due Date for Proposals: July 8, 2013 | |
| Amendments Issued: None | |
| LDBE Requirement: 100% | |
| Project Overview | |
| Download Documents |
RFP 1-13-C150: Electrical Unit Substation Replacement, Dulles Airport UPDATED!
| Description: The Contractor shall furnish all necessary labor, materials, tools, equipment and supervision to replace the existing electrical unit substation at the J.P. Morgan Chase Building at Washington Dulles International Airport with a new electrical unit substation. Work includes replacing 15Kvolt feeder circuits, providing and installing 15Kvolt pad mounted selector switch, duct bank, trenching, pavement replacement, terminations and reconnecting 480volt feeder conductors. | |
| Issue Date: May 24, 2013 | |
| Due Date for Proposals: June 25, 2013 | |
| Amendments Issued: Two | |
| LDBE Requirement: 50% | |
| Project Overview | |
| Download Documents |
