Current Opportunities - Construction

The Metropolitan Washington Airports Authority has issued the following Construction contracting opportunities:

7-15-C012: HVAC Maintenance Services for Dulles Toll Road Facilities NEW!
- Description: The Contractor shall furnish all necessary labor, materials, tools, equipment and supervision to provide on-going maintenance for HVAC systems serving the Dulles Toll Road Administration Building and toll booths on an as-needed basis.
- Solicitation Issue Date: April 17, 2015
- Due Date for Submissions: May 14, 2015
- Amendments Issued: None
- LDBE Requirement: 100%
- Project Overview
- Download Documents

1-15-C050: Pavement Repairs for Runway 1R-19L and Associated Taxiways, Dulles Airport NEW!
- Description: The Contractor shall furnish all necessary labor, materials, tools, equipment and supervision for the construction of pavement repairs to Runway 1R-19L and associated Taxiways K4, K5, and K6 at Washington Dulles International Airport. The work includes PCC panel replacement, spall repairs, linear crack repairs, joint sealant replacement, HMA crack sealing, in-pavement light removal and replacement, and associated pavement marking.
- Solicitation Issue Date: April 9, 2015
- Due Date for Submissions: May 7, 2015
- Amendments Issued: None
- LDBE Requirement: 55%
- Project Overview
- Download Documents

1-15-C054: Task Order Miscellaneous Building Repairs and Alterations, National Airport NEW!
- Description: The Contractor shall furnish all necessary labor, materials, tools, equipment and supervision necessary to perform minor construction, repairs, alterations and maintenance of various types of general projects at Ronald Reagan Washington National Airport. All work to be performed shall be ordered by issuance of task orders.
- Solicitation Issue Date: April 8, 2015
- Due Date for Submissions: May 7, 2015
- Amendments Issued: None
- LDBE Requirement: 100%
- Project Overview
- Download Documents

1-15-C072: Concourse C APM Station Elevator Fitout, Dulles Airport
- Description: The Contractor shall furnish all necessary labor, materials, tools, equipment and supervision required to install a 3-stop electric traction passenger elevator along with ancillary equipment and finishes at the Concourse C AeroTrain (APM) station at Washington Dulles International Airport. The solicitation includes an option to install a 2-stop holeless hydraulic elevator as an alternative.
- Solicitation Issue Date: April 3, 2015
- Due Date for Submissions: April 30, 2015
- Amendments Issued: None
- LDBE Requirement: 10%
- Project Overview
- Download Documents

1-15-C030: Supplemental Fire Protection, Dulles Airport
- Description: The Contractor shall furnish all necessary labor, materials, tools, equipment and supervision required to construct supplemental fire suppression systems for the Southeast Baggage Basement and AeroTrain Maintenance Facility at Washington Dulles International Airport.
- Solicitation Issue Date: March 26, 2015
- Due Date for Submissions: April 23, 2015
- Amendments Issued: None
- LDBE Requirement: None
- Project Overview
- Download Documents