Current Opportunities - Construction

The Metropolitan Washington Airports Authority has issued the following Construction contracting opportunities:

1-15-C051: Old North Boathouse Demolition, National Airport UPDATED!
- Description: The Contractor shall furnish all necessary labor, materials, tools, equipments and supervision for the demolition of the abandoned north boathouse at Ronald Reagan Washington National Airport. All wreckage and remnants, to include hazardous materials, shall be transported off site and properly disposed of. Work also includes removal of existing electrical conduit to the specified termination point and removal of any mechanical devices that remain.
- Solicitation Issue Date: February 25, 2015
- Due Date for Submissions: March 26, 2015
- Amendments Issued: One
- LDBE Requirement: 100%
- Project Overview
- Download Documents

1-15-C028: Taxilane B Reconstruction and Widening, East Section, Dulles Airport UPDATED!
- Description: The Contractor shall furnish all necessary labor, materials, tools, equipment and supervision required for the reconstruction and widening of the east end of Taxilane B starting from the Non-Movement Area marking and extending to east end of Taxilane A4 at Washington Dulles International Airport. The reconstruction area is approximately 75 feet wide and 1,000 feet long and includes full depth reconstruction to be replaced with PCC pavement. The full strength PCC pavement will also be widened approximately 35 feet with a new 40 foot wide shoulder. Maintenance of air traffic, stormwater pollution prevention, pavement marking, and airfield lighting and signage are also included.
- Solicitation Issue Date: February 6, 2015
- Due Date for Submissions: March 12, 2015
- Amendments Issued: Three
- DBE Goal: 25%
- Project Overview
- Download Documents

1-15-C037: Police Range and Training Facility, Dulles Airport UPDATED!
- Description: The Contractor shall furnish all necessary labor, materials, tools, equipment and supervision required to construct the police range and training facility improvements at Washington Dulles International Airport. Work includes construction of one 300-yd and two 50-yd firing ranges, a training building with small paved parking lot, an ammunition storage building, gravel access roads and parking lot, lead remediation, relocation of the existing on-site explosives containers and installation of special systems and utilities.
- Solicitation Issue Date: January 20, 2015
- Due Date for Submissions: March 5, 2015
- Amendments Issued: Three
- LDBE Requirement: 50%
- Project Overview
- Download Documents